Tucuruí Etapa I, Tucuruí, Pará., Brazil

River: Tocantins

Status: In Operation

8 hectares per MW

0 people per MW

Enable javascript to view charts.

Results

Net Present Value-1,084 billion BRL
NPV including net greenhouse gas emissions-1,084 billion BRL
Hectares flooded per MW8 hectares per MW
Gross CO₂ equivalent emissions188,032 thousand metric tonnes
Gross CO₂ equivalent per MW44,295 metric tonnes per MW
Hectares flooded per MW8 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded32,000 hectares
Installed capacity 4,245 MW
Capacity used70%
Construction time7 years
Construction cost5,054,617,000 BRL
Transmission infrastructure cost1,580,894,530,200 BRL
Wholesale price of energy100 BRL
Economic discount rate10%