Language:

HydroCalculator

Tucuruí Etapa I, Tucuruí, Pará., Bolivia

River: Tocantins

Status: In Operation

8 hectares per MW

0 people per MW

Enable javascript to view charts.

Results

Net Present Value-986,291 million USD
NPV including net greenhouse gas emissions-986,212 million USD
Hectares flooded per MW8 hectares per MW
Gross CO₂ equivalent emissions188,032 thousand metric tonnes
Gross CO₂ equivalent per MW44,295 metric tonnes per MW
Hectares flooded per MW8 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded32,000 hectares
Installed capacity 4,245 MW
Capacity used70%
Construction time7 years
Construction cost5,054,617,000 USD
Transmission infrastructure cost1,374,690,895,820 BRL
Wholesale price of energy40 USD
Economic discount rate12.8%