Tabajara, Machadinho d'Oeste - Rondônia, Brazil

River: Ji Parana

Status: Construction Scheduled

368 hectares per MW

0 people per MW

Map of Machadinho d'Oeste - Rondônia, Brazil
Enable javascript to view charts.

Results

Net Present Value621,309 thousand BRL
NPV including net greenhouse gas emissions621,309 thousand BRL
Internal Rate of Return16.7%
Hectares flooded per MW368 hectares per MW
Gross CO₂ equivalent emissions540,699 thousand metric tonnes
Gross CO₂ equivalent per MW1,545 thousand metric tonnes per MW
Hectares flooded per MW368 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded128,800 hectares
Carbon density128 tC/ha
Installed capacity 350 MW
Capacity used54%
Construction time3 years
Construction cost700,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy100 BRL
Economic discount rate9%