Sinop, Sinop - Mato Grosso, Brazil

River: Teles Pires

Status: Proposed project

72 hectares per MW

2 people per MW

Map of Sinop - Mato Grosso, Brazil
Enable javascript to view charts.

Results

Net Present Value933,728 thousand BRL
NPV including net greenhouse gas emissions933,728 thousand BRL
Internal Rate of Return12.5%
Hectares flooded per MW72 hectares per MW
Gross CO₂ equivalent emissions138,533 thousand metric tonnes
Gross CO₂ equivalent per MW300,506 metric tonnes per MW
Hectares flooded per MW72 hectares per MW
People displaced per megawatt2 people per MW

Inputs and assumptions

People displaced1,066 people displaced
Area flooded33,000 hectares
Carbon density128 tC/ha
Installed capacity 461 MW
Capacity used50%
Construction time3 years
Construction cost2,000,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy180.37 BRL
Economic discount rate8.5%