Language:

HydroCalculator

Santo Antônio do Jari, Laranjal do Jari, Amapá, Brazil

River: Jari

Status: Under construction

9 hectares per MW

0 people per MW

Enable javascript to view charts.

Results

Net Present Value-86,151 thousand BRL
NPV including net greenhouse gas emissions-108,394 thousand BRL
Internal Rate of Return9.77%
Hectares flooded per MW9 hectares per MW
Gross CO₂ equivalent emissions20,255 thousand metric tonnes
Gross CO₂ equivalent per MW54,245 metric tonnes per MW
Hectares flooded per MW9 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced80 people displaced
Area flooded3,200 hectares
Installed capacity 373.4 MW
Capacity used57%
Construction time3 years
Construction cost1,300,000,000 BRL
Transmission infrastructure cost3,800,000 BRL
Wholesale price of energy104 BRL
Economic discount rate10.5%