Santa Anita, Magdalena, Beni Department, Bolivia

River: Itonomas

Status: Construction Scheduled

1,000 hectares per MW

0 people per MW

Map of Magdalena, Beni Department, Bolivia
Enable javascript to view charts.

Results

Net Present Value-3,441 thousand USD
NPV including net greenhouse gas emissions-8,797 thousand USD
Cost per MWh excluding environmental costs240 USD per MWh
Hectares flooded per MW1,000 hectares per MW
Gross CO₂ equivalent emissions6,384 thousand metric tonnes
Gross CO₂ equivalent per MW6,384 thousand metric tonnes per MW
Hectares flooded per MW1,000 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded1,000 hectares
Carbon density193 tC/ha
Installed capacity 1 MW
Capacity used35%
Construction time4 years
Turbines phased in from2.5 years
Construction cost, including transmission infrastructure costs3,500,000 USD
Wholesale price of energy20 USD
Economic discount rate12.5%