Rusumo Falls Hydroelectric Project, Ngara, Kagera, Tanzania

River: Kagera River

Status: Proposed project

391 hectares per MW

24 people per MW

Map of Ngara, Kagera, Tanzania
Enable javascript to view charts.

Results

Net Present Value-420,425 thousand USD
NPV including net greenhouse gas emissions-424,299 thousand USD
Cost per MWh excluding environmental costs320 USD per MWh
Hectares flooded per MW391 hectares per MW
Gross CO₂ equivalent emissions11,723 thousand metric tonnes
Gross CO₂ equivalent per MW146,538 metric tonnes per MW
Hectares flooded per MW391 hectares per MW
People displaced per megawatt24 people per MW

Inputs and assumptions

People displaced1,910 people displaced
Area flooded31,300 hectares
Installed capacity 80 MW
Capacity used55%
Construction time3 years
Construction cost, including transmission infrastructure costs486,900,000 USD
Wholesale price of energy57.03 USD
Economic discount rate15.8%

Vegetation & carbon density

Vegetation type or land coverCarbon density
(tC/ha)
Area flooded
(hectares)
Total carbon
(tonnes)
1.Tropical Grassland, Wet, Mostly grassland7.925,04080%197,816.0
2.Tropical Shrub cover46.03,13010%143,980.0
3.Tropical Cultivated land5.03,13010%15,650.0
Total31,300100%357,446.0