Language:

HydroCalculator

Pucará, Provincia Tungurahua, Ecuador

Status: In Operation

5 hectares per MW

0 people per MW

Results

Net Present Value-21,025 thousand USD
Hectares flooded per MW5 hectares per MW
Gross CO₂ equivalent emissions105,270 metric tonnes
Gross CO₂ equivalent per MW1,504 metric tonnes per MW
Hectares flooded per MW5 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded330 hectares
Installed capacity 70 MW
Capacity used90%
Construction time2.6 years
Construction cost91,840,000 USD
Transmission infrastructure cost0 USD
Wholesale price of energy26.2 USD
Economic discount rate12.6%