Language:

HydroCalculator

Mutwanga, North Kivu, Argentina

River: Butao

Status: Under construction

1 hectare per MW

0 people per MW

Enable javascript to view charts.

Results

Net Present Value-1,052 thousand USD
Hectares flooded per MW1 hectare per MW
Gross CO₂ equivalent emissions167 metric tonnes
Gross CO₂ equivalent per MW167 metric tonnes per MW
Hectares flooded per MW1 hectare per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded1 hectare
Installed capacity 1 MW
Capacity used60%
Construction time2 years
Construction cost1,500,000 USD
Transmission infrastructure cost1,200,000 USD
Wholesale price of energy50 USD
Economic discount rate12%