HydroCalculator

Mantaro 270 (Man 270), Tayacaja, Departamento de Huancavelica, Peru

River: Mantaro

Status: Proposed project

1 hectare per MW

0 people per MW

Map of Tayacaja, Departamento de Huancavelica, Peru
Enable javascript to view charts.

Results

Net Present Value165,903 thousand USD
NPV including net greenhouse gas emissions180,316 thousand USD
Internal Rate of Return15.1%
Cost per MWh excluding environmental costs45 USD per MWh
Hectares flooded per MW1 hectare per MW
Gross CO₂ equivalent emissions1,039 thousand metric tonnes
Gross CO₂ equivalent per MW3,634 metric tonnes per MW
Hectares flooded per MW1 hectare per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded420 hectares
Installed capacity 286 MW
Capacity used69%
Construction time5 years
Construction cost302,398,834 USD
Transmission infrastructure cost121,007,457 USD
Wholesale price of energy57 USD
Economic discount rate11%

Vegetation & carbon density

Carbon density
(tC/ha)
Area flooded
(hectares)
Total carbon
(tonnes)
1.87.031575%27,405.0
2.52.010525%5,460.0
Total420100%32,865.0