HydroCalculator

Jatobá, Itaituba, Pará

River: Rio Tapajós

Status: Proposed project

28 hectares per MW

1 person per MW

Map of Itaituba - Para, Brazil
Enable javascript to view charts.

Results

Net Present Value-1,887 million BRL
NPV including net greenhouse gas emissions-1,887 million BRL
Internal Rate of Return6.75%
Hectares flooded per MW28 hectares per MW
Gross CO₂ equivalent emissions147,509 thousand metric tonnes
Gross CO₂ equivalent per MW63,092 metric tonnes per MW
Hectares flooded per MW28 hectares per MW
People displaced per megawatt1 person per MW

Inputs and assumptions

People displaced1,303 people displaced
Area flooded64,600 hectares
Carbon density75 tC/ha
Installed capacity 2,338 MW
Capacity used55%
Construction time7 years
Construction cost8,800,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy100 BRL
Economic discount rate9%