Jardim do Ouro, Itaituba - Para, Brazil

River: Jamanxim

Status: Construction Scheduled

188 hectares per MW

1 person per MW

Map of Itaituba - Para, Brazil
Enable javascript to view charts.

Results

Net Present Value-312,656 thousand BRL
NPV including net greenhouse gas emissions-312,656 thousand BRL
Internal Rate of Return5.68%
Hectares flooded per MW188 hectares per MW
Gross CO₂ equivalent emissions172,452 thousand metric tonnes
Gross CO₂ equivalent per MW759,702 metric tonnes per MW
Hectares flooded per MW188 hectares per MW
People displaced per megawatt1 person per MW

Inputs and assumptions

People displaced200 people displaced
Area flooded42,600 hectares
Carbon density128 tC/ha
Installed capacity 227 MW
Capacity used55%
Construction time5 years
Construction cost1,000,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy100 BRL
Economic discount rate10%