Language:

HydroCalculator

Jamanxim, Itaituba, Pará

River: Jamanxim

Status: Construction Scheduled

8 hectares per MW

0 people per MW

Map of Itaituba - Para, Brazil
Enable javascript to view charts.

Results

Net Present Value1,116 million BRL
NPV including net greenhouse gas emissions1,116 million BRL
Internal Rate of Return13.2%
Hectares flooded per MW8 hectares per MW
Gross CO₂ equivalent emissions29,957 thousand metric tonnes
Gross CO₂ equivalent per MW34,003 metric tonnes per MW
Hectares flooded per MW8 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded7,400 hectares
Carbon density128 tC/ha
Installed capacity 881 MW
Capacity used54%
Construction time5 years
Construction cost1,968,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy100 BRL
Economic discount rate8.5%