Language:

HydroCalculator

Inambari, Inambari, Madre de Dios, Peru

River: Inambari

Status: Proposed project

17 hectares per MW

2 people per MW

Enable javascript to view charts.

Results

Net Present Value-115,945 thousand PEN
NPV including net greenhouse gas emissions-73,171 thousand PEN
Internal Rate of Return9.91%
Hectares flooded per MW17 hectares per MW
Gross CO₂ equivalent emissions115,364 thousand metric tonnes
Gross CO₂ equivalent per MW52,438 metric tonnes per MW
Hectares flooded per MW17 hectares per MW
People displaced per megawatt2 people per MW

Inputs and assumptions

People displaced4,000 people displaced
Area flooded37,800 hectares
Vegetation type or land coverAmericas; Tropical Rainforest; Forest, Cropland Mosaic; Non-Frontier - 96.5
Carbon density96.50 tC/ha
Installed capacity 2,200 MW
Capacity used70%
Construction time5 years
Construction cost11,297,440,000 PEN
Transmission infrastructure cost2,310,840,000 PEN
Wholesale price of energy157 PEN
Economic discount rate10%