Status: Proposed project

1 hectare per MW

0 people per MW

Results

Net Present Value584,856 thousand KHR
Hectares flooded per MW1 hectare per MW
Gross CO₂ equivalent emissions3,373 metric tonnes
Gross CO₂ equivalent per MW9 metric tonnes per MW
Hectares flooded per MW1 hectare per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced66 people displaced
Area flooded184 hectares
Installed capacity 360 MW
Capacity used75%
Construction time3 years
Construction cost360,000,000 USD
Transmission infrastructure cost0 USD
Wholesale price of energy55 USD
Economic discount rate10%