Language:

HydroCalculator

Colíder, Nova Canaã do Norte, Mato Grosso, Brazil

River: Teles Pires

Status: Under construction

38 hectares per MW

1 person per MW

Enable javascript to view charts.

Results

Net Present Value-589,216 thousand BRL
NPV including net greenhouse gas emissions-678,530 thousand BRL
Internal Rate of Return5.62%
Hectares flooded per MW38 hectares per MW
Gross CO₂ equivalent emissions69,584 thousand metric tonnes
Gross CO₂ equivalent per MW231,948 metric tonnes per MW
Hectares flooded per MW38 hectares per MW
People displaced per megawatt1 person per MW

Inputs and assumptions

People displaced295 people displaced
Area flooded11,400 hectares
Installed capacity 300 MW
Capacity used60%
Construction time5 years
Construction cost1,500,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy103.4 BRL
Economic discount rate10.5%