Language:

HydroCalculator

Coca Codo Sinclair, Provincia Napo; Cantón El Chaco; Sistema hidrográf, Ecuador

River: Coca

Status: Under construction

0 hectares per MW

2 people per MW

Enable javascript to view charts.

Results

Net Present Value134,993 thousand USD
NPV including net greenhouse gas emissions185,888 thousand USD
Internal Rate of Return15.9%
Hectares flooded per MW0 hectares per MW
Gross CO₂ equivalent emissions1,192 thousand metric tonnes
Gross CO₂ equivalent per MW795 metric tonnes per MW
Hectares flooded per MW0 hectares per MW
People displaced per megawatt2 people per MW

Inputs and assumptions

People displaced2,377 people displaced
Area flooded300 hectares
Installed capacity 1,500 MW
Capacity used90%
Construction time6 years
Construction cost2,000,000,000 USD
Transmission infrastructure cost0 USD
Wholesale price of energy46.9 USD
Economic discount rate14.9%