Cebadas, Guamote, Ecuador

Status: Proposed project

0 hectares per MW

0 people per MW

Results

Net Present Value9,812 thousand USD
Hectares flooded per MW0 hectares per MW
Gross CO₂ equivalent emissions319 metric tonnes
Gross CO₂ equivalent per MW46 metric tonnes per MW
Hectares flooded per MW0 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded1 hectare
Installed capacity 6.9 MW
Capacity used90%
Construction time1 year
Construction cost10,620,000 USD
Transmission infrastructure cost0 USD
Wholesale price of energy46.9 USD
Economic discount rate9.8%