Cachoeira dos Patos, Itaituba, Pará

River: Jamanxim

Status: Construction Scheduled

22 hectares per MW

0 people per MW

Map of Itaituba - Para, Brazil
Enable javascript to view charts.

Results

Net Present Value120,812 thousand BRL
NPV including net greenhouse gas emissions120,812 thousand BRL
Internal Rate of Return9.76%
Hectares flooded per MW22 hectares per MW
Gross CO₂ equivalent emissions47,364 thousand metric tonnes
Gross CO₂ equivalent per MW89,704 metric tonnes per MW
Hectares flooded per MW22 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded11,700 hectares
Carbon density128 tC/ha
Installed capacity 528 MW
Capacity used52%
Construction time5 years
Construction cost1,500,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy100 BRL
Economic discount rate10%