Language:

HydroCalculator

Cachoeira do Caí, Itaituba, Pará

River: Jamanxim

Status: Construction Scheduled

52 hectares per MW

0 people per MW

Map of Itaituba - Para, Brazil
Enable javascript to view charts.

Results

Net Present Value459,175 thousand BRL
NPV including net greenhouse gas emissions459,175 thousand BRL
Internal Rate of Return11.1%
Hectares flooded per MW52 hectares per MW
Gross CO₂ equivalent emissions170,024 thousand metric tonnes
Gross CO₂ equivalent per MW211,999 metric tonnes per MW
Hectares flooded per MW52 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced150 people displaced
Area flooded42,000 hectares
Carbon density128 tC/ha
Installed capacity 802 MW
Capacity used52%
Construction time5 years
Construction cost2,040,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy100 BRL
Economic discount rate10%