Cachoeira Caldeirão, Porto Grande, Amapá

River: Araguari

Status: Construction Scheduled

11 hectares per MW

5 people per MW

Map of Porto Grande - Amapá, Brazil
Enable javascript to view charts.

Results

Net Present Value-1,672 million BRL
NPV including net greenhouse gas emissions-1,688 million BRL
Cost per MWh excluding environmental costs192 BRL per MWh
Hectares flooded per MW11 hectares per MW
Gross CO₂ equivalent emissions10,451 thousand metric tonnes
Gross CO₂ equivalent per MW47,721 metric tonnes per MW
Hectares flooded per MW11 hectares per MW
People displaced per megawatt5 people per MW

Inputs and assumptions

People displaced1,102 people displaced
Area flooded2,400 hectares
Carbon density134 tC/ha
Installed capacity 219 MW
Capacity used55%
Construction time3.5 years
Construction cost1,400,000,000 BRL
Transmission infrastructure cost6,916,628 BRL
Wholesale price of energy12.57 BRL
Economic discount rate8.5%