River: Rio Branco

Status: Construction Scheduled

79 hectares per MW

0 people per MW

Map of Caracaraí - Roraima, Brazil
Enable javascript to view charts.

Results

Net Present Value727,332 thousand BRL
NPV including net greenhouse gas emissions727,332 thousand BRL
Internal Rate of Return10.2%
Hectares flooded per MW79 hectares per MW
Gross CO₂ equivalent emissions226,326 thousand metric tonnes
Gross CO₂ equivalent per MW319,488 metric tonnes per MW
Hectares flooded per MW79 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded55,908 hectares
Carbon density128 tC/ha
Installed capacity 708.4 MW
Capacity used57%
Construction time5 years
Construction cost3,840,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy180.37 BRL
Economic discount rate8.5%